Aggregate, Sand Gravel
There is an extra winter operations charge for operations from November 1 through April 30 for the Klatt Road Pit. The minimum shift for winter operations is 4 (four) hours. The winter operations charge is in addition to any cost for materials. Winter Conditions Delivery rates by the ton or by the truck load are void under winter conditions.